IDAHO STAGE CONSTRUCTION
stabilization building
Completed in Death Valley, Nevada, this US Ecology project consisted of a new pre-engineered metal structure and the installation of two mixing tanks, above ground storage tanks, underground storage tank and related system elements. The scope of work also included the installation of all equipment including but not limited to Bag House, Centrifugal Pumps, Receiver Tanks, Drum Shredder, Mixing Tanks, Misting System, Actuating Valves, Activated Carbon Vessels, Storage Silos, Water Tanks, etc.